How do I get BC Hydro service at a new location?

Your landlord can also confirm your tenancy. If you need BC Hydro service at a location that does not have an electrical connection (such as a new condo development, new vacation home or cabin), you will need to apply for a new electrical connection. Are you a business customer? Business customers can start, stop or move service online.

What happens if the installation does not meet BC Hydro requirements?

If crews cant proceed with the request because the installation does not meet BC Hydro requirements, service will be rejected and call back charges will be applied. The point of attachment must be within 7 metres above the ground.

Do I need an intermediate pole for BC Hydro?

If the service length exceeds 30 metres, an intermediate pole may be required. Service connections to private property poles or garages may help alleviate problems resulting from clearances and other BC Hydro, WorkSafe BC and Electrical Code requirements. Trees must be cleared to 3 metres on each side of any secondary conductor.

When do I need a pull box for BC Hydro?

If the total number of bends installed between BC Hydros duct stub off point and the meter base exceeds a composite angle of 135 degrees, a pull box may be required. The minimum radius of any conduit bend must be 900 mm (3 feet). All underground service conduits must be drained at the building entrance as per the BC Electrical Code.

How do I open a BC Hydro account?

Opening a BC Hydro account to get electrical service at your home or business takes just a few steps. Start by letting us know what type of electrical service you need, and where. Get started by selecting your service below and signing up online.

How do I move my BC Hydro service to another location?

To start or move your service, youll need your landlords name and phone number. Your landlord can also confirm your tenancy. If you need BC Hydro service at a location that does not have an electrical connection (such as a new condo development, new vacation home or cabin), you will need to apply for a new electrical connection.

What happens if the installation does not meet BC Hydro requirements?

If crews cant proceed with the request because the installation does not meet BC Hydro requirements, service will be rejected and call back charges will be applied. The point of attachment must be within 7 metres above the ground.

How do I remove a BC Hydro meter from my property?

Removal of service. BC Hydro crews will remove the service and the meter upon customer request at a vacant premise. Only the registered owner or authorized business partner can request the removal of service. Contact our Electrical Services Coordination Centre at 1 877 520 1355 to request a meter removal.

Do I need a pull box for BC Hydro ductwork?

If the total number of bends installed between BC Hydros duct stub off point and the meter base exceeds a composite angle of 135 degrees, a pull box may be required. The minimum radius of any conduit bend must be 900 mm (3 feet).

Do I need an intermediate pole for BC Hydro?

If the service length exceeds 30 metres, an intermediate pole may be required. Service connections to private property poles or garages may help alleviate problems resulting from clearances and other BC Hydro, WorkSafe BC and Electrical Code requirements. Trees must be cleared to 3 metres on each side of any secondary conductor.

What are the conditions of my service with BC Hydro?

For a full description of the conditions of your service with BC Hydro, please refer to the Electric Tariff. To avoid a disruption in electricity service, set up an account before you move into your property. We disconnect electricity when no one applies for service at a property after the previous account holder moves out.

How do I install BC Hydro service in my building?

BC Hydro prefers installation of the service duct and meter base on the outside of the building wall. After the service has been connected, a removable and non-combustible aesthetic covering can be installed over the duct and meter base. there is a 25 mm access cavity around the meter base. Note: Drawing is for reference only.